I am going to build a sluice for Colorado and need some feed back on Gold Hog Mat.
Flair that runs into sluice.
First foot or so of sluice i was going to leave bare.
Then i wanted to use a 1 foot of Gold Hog Scrubber Mat.
After that i was thinking of 3 feet of Razor back then a foot of something like UR Mat at the end.
I need to know how to not glue it down permanent so that i can swap out different mat combinations.
Would be nice to also use it as a highbanker.
Anyone that has comments please do.