Now, back to my original question:
What would be the required head/pressure to operate a 1 1/2 inch ( Keene ) suction nozzle?
Gold Seeker wrote:Most smaller dredge pumps put out about a minimum of around 70 PSI and 90 to 100 GPM, bigger dredges will have higher PSI and especially higher GPM, I have seen homemade smaller dredges with pumps putting out 40 to 50 PSI and 90 to 100 GPM and work, but I would try to shoot for 60 to 70 PSI and at least 80 to 90 GPM. IMHO
Skip
Users browsing this forum: No registered users and 44 guests